Fit-out and cost estimate: what to check before the first tile
Share
Save
By Alex Nekrashevich. The information is up to date as of late November 2026. We update this article, so check back.
Who this is for: anyone who has found premises and is about to fit them out: the skilled professional on a small budget, the dreamer who wants it "beautiful", anyone who has moved to Norway, and the beginner drawing up a cost estimate for the first time.
In short
A fit-out in rented premises is money you probably will not take with you. So check the premises and the lease first, and lay the tiles afterwards. Multiply everything you have worked out by 1.5. Choose commercial-grade equipment and plumbing, not "like at home". And do not spend the whole budget on the fit-out: you also need money for marketing and a 6-month buffer.
1. Check first, fit out afterwards
The most expensive fit-out mistakes are visible before, not after. Before you lay the first tile, check:
- Power. How much power the premises have. In our experience, getting more power can cost as much as half the fit-out. The local grid company provides more capacity, and its name is on the electricity bill. If the grid must be extended or reinforced, the grid company must charge a connection contribution (RME). The cost varies: ask the grid company before you sign.
- Electrician. Electrical work on the premises must be done by a business registered in the Register of Electrical Enterprises (Elvirksomhetsregisteret) (forskrift om elektroforetak § 3). Ask for the organisation number and check it.
- Ventilation and extraction. Can you run extraction outside, and is there a separate shaft? In a condominium, alterations beyond normal maintenance need a two-thirds majority at the annual meeting (eierseksjonsloven § 49). Extraction with an external duct is a facade change that often needs an application to the municipality (plan- og bygningsloven § 20-1). A salon on the ground floor of a residential complex without its own ventilation shaft: the owner spent 2 months and gave up.
- Wet areas and drainage. Turn on the water and let it run. An old drain blocks with one wet wipe. Moving a wet area is expensive.
- Air conditioning and signage. In Oslo an outdoor unit, fan and external extraction count as a facade change. One flat sign of up to 3 m² on the wall can normally go up without an application if it does not conflict with the municipality's plans (byggesaksforskriften § 4-1). Check with your municipality.
More: "How to view commercial premises in Norway before you rent: 15 questions".
2. The fit-out and the lease: what stays with the landlord
Tiles, walls, wiring and windows are fixed improvements. The law gives some protection, but it can be contracted out of: if you made substantial improvements with the landlord's consent, you can claim compensation (husleieloven § 10-5), and without a special agreement the landlord cannot require the premises restored to their original state for changes you were entitled to make, and never if that would be disproportionately costly (§ 10-2). Check whether the lease says all improvements go to the owner without compensation.
Our own case: the video studio. We invested about EUR 25,000 in a basement in a shopping centre on the outskirts of Tbilisi: heating, walls, partitions for 4 shooting areas, lighting and ventilation. After a year and a half the owner saw the fit-out and raised the rent from EUR 1,200 to EUR 2,500. We moved out and did not get our deposit back. One clause we missed in the lease cost more than the whole fit-out.
Before you fit out, the lease should state:
- a rent-free period while you fit out (say it honestly: "while I fit out I can't pay full rent, and everything I invest stays with you");
- how long the rent cannot be raised after your fit-out;
- what happens to your investment if the lease ends early;
- who pays for more power and for repairs to shared wiring and pipes.
More: "Commercial lease in Norway: what to check before you sign".
3. The estimate: multiply by 1.5
Beginners count "walls and hardware": the fit-out, equipment and furniture. In our experience hidden costs eat at least half of the estimate. So: multiply everything you have worked out by 1.5.
What people forget in the fit-out estimate:
- cleaning after the fit-out;
- waste removal;
- new wiring for the equipment (a bakery oven runs up to 16 hours a day);
- signage, price tags, a little decor and a chair for reception;
- new locks when you move in;
- small repairs after opening: sockets, taps, plumbing.
Do not spend everything on the fit-out. In cafés and restaurants, in our experience, the fit-out and ventilation often eat the whole budget, leaving nothing for marketing. After the fit-out you also need a buffer for at least 6 months of trading. More: "How much money you need to start and for the first 6 months".
4. Plumbing and equipment: commercial, not "like at home"
In a coffee shop, café or guesthouse the tap, toilet and mixer get used many times more than at home. An ordinary tap "like the one I have at home, it works fine" will break quickly here. Commercial equipment costs more, but you will keep replacing the cheap kind. And someone has to take out the old one and fit the new one.
Add a line to your estimate for "who does it": who you will give small repairs, equipment replacement and cleaning to, and what it costs. You will not manage everything yourself.
5. Contractors and timing
- In our experience: if a contractor promises 5 days, it is good if they finish in 10. Allow plenty of time: while you fit out, the rent may already be running.
- The result will not match the picture in your head unless you write a detailed brief: what, where, which colour, which sockets and how many.
- Do not print lots of signs, business cards and flyers straight away: if something changes, you will have to reprint everything.
6. Equipment: buy or lease
Bought equipment sells for much less when you close. Example: in our experience a coffee machine later sells for a third or a quarter of the price, so you are better off leasing it. More in "Equipment: buy or lease".
7. What not to save on
| Do not save on (in our experience) | Why |
|---|---|
| Checking power, ventilation and wet areas before the fit-out | redoing it afterwards costs many times more |
| Commercial plumbing and equipment | domestic kit breaks and needs constant replacement |
| A lease checked before the fit-out | your investment can stay with the landlord, and the rent can go up |
| A 6-month buffer after the fit-out | without a buffer, a beautiful fit-out closes within a couple of months |
Advice by business type
Coffee shop. Water treatment and filters, power for the coffee machine, air conditioning (the outdoor unit may need an application). Better to lease the coffee machine.
Café and restaurant. Power for hobs and ovens, room for a powerful extractor. The biggest mistake: the fit-out and ventilation ate the whole budget, leaving nothing for marketing.
Bakery and patisserie. Wiring for the oven (up to 16 hours a day), extraction that residents above you do not complain about.
Hair salon and barbershop. Dedicated ventilation, water at each workstation, power for equipment and hairdryers.
Local shop. Example: a 24/7 local shop in Norway that we work with. Fridges and freezers that run around the clock, and electricity at the business tariff. More experience to come.
Pet shop. Storage for feed sacks and easy deliveries.
Shoe repair and everyday services. A small fit-out; what matters most is a sign people can see from the road.
Car repair and car wash. An oil separator, waste collection, heating tall workshops, water and power.
Dentist and clinic. Before the fit-out and before you sign, check that the premises suit a clinic: ceiling height, ventilation, water and drainage in each treatment room and space for the equipment.
Hotel and guesthouse. Commercial plumbing, equipment checked before the season (the air conditioning at 35 degrees), small things in the room.
Checklist: before the fit-out starts
| Check | How to do it | Warning sign |
|---|---|---|
| Power | the premises documents, an electrician, the grid company | you need ovens or heavy equipment, but the power only covers light kit |
| Electrician | organisation number in Elvirksomhetsregisteret | "a friend who knows about electrics" |
| Ventilation | the condominium board and the annual meeting decision, the municipality | the shaft is shared with flats, and there is no written consent |
| Wet areas | turn on the water and let it run yourself | old drainage, the wet area has to be moved |
| Lease | rent-free period, time without a rent increase, what happens to your investment | the lease says nothing about this |
| Estimate | multiply everything by 1.5 | no money left for marketing and a buffer |
| Equipment | commercial, not domestic | choosing "like at home" to save money |
| Contractor | a detailed brief, time with a margin | everything agreed verbally |
| Who does it | who repairs and replaces after opening | "I'll sort it out myself" |
Next steps
Lease checked and the estimate has a margin? Read "How much money you need to start", then "Equipment: buy or lease".
This article is not legal or financial advice. Fit-out prices vary from place to place: ask for written quotes.
Questions and answers
Power, ventilation and extraction, wet areas and drainage, and whether you may install air conditioning and a sign. And the lease: what happens to your investment.
Tiles, walls, wiring and windows are fixed improvements. The law gives some protection (husleieloven § 10-2 and § 10-5), but it can be contracted out of, so check the lease before you fit out.
In our experience, multiply everything by 1.5: hidden costs eat at least half of the estimate.
In a café, coffee shop or guesthouse the tap and toilet are used many times more than at home. Domestic kit breaks quickly, and replacing it costs money and labour.
It varies. If the grid must be reinforced, the grid company charges a connection contribution (RME). Ask the grid company for a price before you sign.
A business registered in the Register of Electrical Enterprises (forskrift om elektroforetak § 3). Check the organisation number before you give them the job.
External extraction is a facade change that often needs an application (plan- og bygningsloven § 20-1), and in Oslo this also applies to outdoor units. In a condominium you need a decision at the annual meeting.
Set aside money for marketing and a buffer for at least 6 months of trading. In cafés the fit-out and ventilation often eat everything.
Write a detailed brief: what, where, which colour and how many sockets. Verbal agreements are almost always understood differently.
In our experience, plan for roughly twice as long as the contractor promises, and remember the rent may be running while you fit out.
We check your location or lease before you sign
Don't want to do it all yourself? The Madloba Consult team looks at your location on Google Maps and goes through the questions in this guide with you before you sign. We do not give legal advice: a lawyer checks the contract itself. Running a business in Norway? What is included and what it costs is on the page For businesses in Norway. You will also find the form there.